03-7846 5177 Arrange a site visit

Projects

FGRG and FGRC works, Masjid Klang Gate

Completed
September 2020
Location
Hulu Klang, Selangor
Our role
Design & Build
For
TB Jaya Sdn Bhd
The prayer-hall wall, arches and ornamental surfaces.
The prayer-hall wall, arches and ornamental surfaces.
The dome, decorative band and mihrab along the prayer hall.
The dome, decorative band and mihrab along the prayer hall.
Ceiling and wall detailing above the scaffold during installation.
Ceiling and wall detailing above the scaffold during installation.

The patterned dome ceiling, mihrab and wall detailing for the rebuilt Masjid Kampung Klang Gate.

The brief

Specialist FGRG and FGRC works for the rebuilt Masjid Kampung Klang Gate, under a Design & Build contract.

What we delivered

The patterned dome ceiling, the mihrab surround and the wall and screen detailing, cast in FGRG and FGRC and installed from scaffold inside the prayer hall.

Our package: the specialist FGRG and FGRC works.

Delivery

  1. Jul 2019Work begins
  2. Sep 2020Handed over, 30 September

Photographs

Planning something similar?

We will look at your drawings or your site and tell you how we would build it.

Call Arrange a site visit